Roadrunner Saw Cutting
#
Roadrunner Saw Cutting
#
Roadrunner Saw Cutting
#
Manhole Staging
#
Manhole Staging
#
Manhole Staging
#
Heavy Equipment In Use on Nantucket
#
Heavy Equipment In Use on Nantucket
#
Heavy Equipment In Use on Nantucket
#
Temporary Sewer Bypass
#
Grinder Pump Staging
#
Sewer Pipe Staging
#
Excavation for verifying depth of grinder pumps
#
Excavation for verifying depth of grinder pumps
#
District Personnel & Contractors Determine Location for Grinder Pump
#
Testing Pipe Bedding for Compaction
#
4" water main crossing the road at Cutty Sark
#
Newly installed manhole at Cutty Sark intersection. Next to it is the 4" force main from the lift station
#
Back filled after new sewer pipe installed, awaiting asphalt

Hartstene Pointe Water-Sewer District

(360) 427-2413

 

772 E Chesapeake Dr
Shelton, WA 98584

Water Pressure will be Reduced for Several Residences for Leak Repairs

7/25/23 11:25am
The crew is working to fix a leak in the water distribution system. Due to unexpected circumstances, one of the street water valves needs to be partially closed in order to complete the repairs. This will affect water pressure for several residences around Barbary and Pointes Dr East. The crew will work as quickly as they safely can to complete the repairs and restore pressure back to the system.